Bizator  /  Adverts  /  real estate  /  real estate  /  industrial buildings

Plant wall materials and blocks of aerated concrete, lime

Offer type: salePublished: 08.07.2014
Seller:AGB Roman
Phones:
Show phone
Write a message
Address:Ukraine, Odessa oblast'
We offer for sale a factory wall materials and blocks of aerated concrete, lime.
The plant is located in the district centre of Odessa region on an area of 16.8 hectares Enterprise borders with the port and asphalt plant. The main specialization of the plant: the production of wall materials of aerated concrete, lime, aggregates.
Total area of buildings and structures owned by the company - 20 019 square meters, including the main production building - 8 198 square meters
The plant is equipped with all the necessary infrastructure: gas-authorized consumption 5540 m3/h, 3 PTS with two 1000kVA transformers and one 630 kVA, steam, water, backed by tanks, sewage. The territory comes W/a path with a ramp for unloading bulk materials and a rack for receiving oil with zero capacity. The company has its own transport: dump trucks, front-end loader, locomotive, crane, bulldozer, car and minibus.
Near the plant selected sand pit with an area of 4 hectares with a resolution of extraction. Lime is produced in two mine own pouring furnaces with the capacity of 50 tons each node enrichment.
The company started the implementation of high-performance modern technology enables the manufacture of products from cellular concrete, the appropriate level of quality European and world standards. The basis of the selected production line of the company "WEHRHAHN" type B6-900-SMART capacity 900 m3 per day. Developed project line (123 thousand euros), documentation for foundations equipment (89,6 thousand UAH), prepared for installation (162,9 thousand UAH), preobretena equipment for batching, mixing, pre-hardening value of € 1.1 million. To complete the upgrade, you must purchase a cutting line, shape, equipment autoclaving and transport, sorting and packaging, electric control an estimated cost of 5 million euros and to carry out construction work estimated cost of 50 million USD.
Read more here http://bizmart.info/buy/view/4391/
The plant is sold at a price equal to the cost of already purchased equipment.